Online Standards Store PDF
Land allocation for water mains and sewage collectors
Document status: Active
Design of overhead power lines with a voltage of 0.38 kV with insulated wires SIP-4
Document status: Active
Geodetic works in construction (amd. 06.11.2019 - 178-NK)
Document status: Active
Actions on structures. Part 1-6. General actions. Actions during execution (including cor. as of July 2008)
Document status: Active
Multicompartment residential buildings (amd. 01.03.2023)
Document status: Active