Cables, wires and cords. Methods of construction checking
Document status: Active
Power transformers. Methods of short-circuit tests
Document status: Active
Low-voltage switchgear and controlgear assemblies. Part 1. Requirements for type-tested and partially type-tested assemblies. General technical requirements and methods of tests
Document status: Active
Refrigerating systems using positive displacement compressor. Methods of testing
Document status: Active
Heaters for systems of regeneration of steam turbines for steam power plants. General specifications
Document status: Active
United power system and isolated power systems. Operative-dispatch management. Switching in electrical facilities. General requirements
Document status: Active