Lifts. Installation, starting-up and adjustment works of dispatch control systems. Rules of the organization and manufacture of works, performance control and requirement for results of works
Document status: Active
Printed boards and printed board assemblies. Design and use. Part 1-2. Generic requirements. Controlled impedance
Document status: Active
Global navigation satellite system. Regional navigation and information systems. Purpose, composition and characteristics of subsystem for monitoring the housing and communal services transport, including road machines for winter service, garbage trucks and other technic means on the territory of the subject of the Russian Federation
Document status: Active
Low power television transmitters. Basic parameters. Technical requirements. Measuring methods
Document status: Active