Hydro power plants. Part 1-4. Hydraulic engineering constructions of hydroelectric power stations. The general requirements to the organization and realization of monitoring
Document status: Active
Plastics and ebonite. Determination of indentation hardness by means of a durometer (Shore hardness)
Document status: Active
Protection against corrosion of concrete and reinforced concrete constructions. Test methods
Document status: Active
Overhead travelling and gantry cranes. Controls. Position and characteristics
Document status: Replaced by GOST 34465.5-2023