Hydrotechnical tunnels. With amendments
Document status: Replaced by SHNK 2.06.02-23
Overall stability of geotechnical facilities
Document status: Active
Stores of dry fertilizers and crop protection chemicals
Document status: Replaced by SHNK 2.09.11-22
Loads and actions on buildings. Snow loads. Wind actions
Document status: Active
Outdoor water supply and sewerage networks and structures
Document status: Replaced by QR 05.04-23
Disposal areas for treatment and burial of toxic industrial wastes. Basic design provisions. With Amendment No.1
Document status: Active