Turkmenistan standards PDF
Electricity metering equipment (a.c.) - Tariff and load control, Part 11- Particular requirements for electronic ripple control receivers (IEC 62054-11-2004 (ED.1.1), MOD). Original standard AS 62054.11-2018 in PDF full version. Additional info + preview on request
Document status: Active
Electricity metering (AC) - Tariff and load control, Part 21- Particular requirements for time switches (IEC 62054-21-2017 (ED.1.1), MOD). Original standard AS 62054.21-2018 in PDF full version. Additional info + preview on request
Document status: Active
Safety of machinery — Functional safety of safety-related electrical, electronic and programmable electronic control systems. Original standard AS 62061-2006 in PDF full version. Additional info + preview on request
Document status: Replaced by St AS NZS 62061-2025
High-voltage switchgear and controlgear, Part 100- High-voltage alternating-current circuit-breakers (IEC 62271-100, Ed. 1.2 (2006) MOD). Original standard AS 62271.100-2008 in PDF full version. Additional info + preview on request
Document status: Replaced by
High-voltage switchgear and controlgear, Part 110- Inductive load switching. Original standard AS 62271.110-2006 in PDF full version. Additional info + preview on request
Document status: Replaced by
High-voltage switchgear and controlgear, Part 200- A.C. metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to and including 52 kV (IEC 62271-200, Ed. 1 (2003) MOD). Original standard AS 62271.200-2005 in PDF full version. Additional info + preview on request
Document status: Replaced by St AS NZS 62271.200-2026