IEC 61557-7-2023 PDF

St IEC 61557-7-2023

Name in English:
St IEC 61557-7-2023

Name in Russian:
Ст IEC 61557-7-2023

Description in English:

Original standard IEC 61557-7-2023 in PDF full version. Additional info + preview on request

Description in Russian:
Оригинальный стандарт IEC 61557-7-2023 в PDF полная версия. Дополнительная инфо + превью по запросу
Document status:
Active

Format:
Electronic (PDF)

Delivery time (for English version):
1 business day

Delivery time (for Russian version):
365 business days

SKU:
stiec05436

Choose Document Language:
€35

Full title and description

Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. — Equipment for testing, measuring or monitoring of protective measures — Part 7: Phase sequence. This publication is the consolidated edition incorporating IEC 61557-7:2019 with Amendment 1 (2023), and specifies requirements for instruments used to determine phase sequence in three‑phase distribution systems.

Abstract

IEC 61557-7 sets performance, safety, marking and testing requirements for portable and bench test equipment that detect or indicate the phase sequence (rotation) of three‑phase systems. The document clarifies measurement conditions, influence quantities and minimum functional requirements to ensure reliable and safe phase‑sequence indication in distribution and industrial environments.

General information

  • Status: Published — consolidated edition (IEC 61557-7:2019 + AMD1:2023).
  • Publication date: Amendment published 25 August 2023 (consolidated edition shows 2023).
  • Publisher: International Electrotechnical Commission (IEC).
  • ICS / categories: 17.220.20; 29.080.01; 29.240.01 (measurement, electrical insulation, power distribution).
  • Edition / version: Edition 3.0 (IEC 61557-7:2019 consolidated with Amendment 1:2023).
  • Number of pages: 9 (consolidated amendment document length).

Scope

This part of IEC 61557 specifies the requirements applicable to measuring equipment for testing the phase sequence in three‑phase distribution systems. It is intended to be used in conjunction with IEC 61557-1 (general requirements for the series) where applicable and addresses functional performance, safety, marking and test procedures specific to phase‑sequence instruments.

Key topics and requirements

  • Functional requirement: reliable indication/detection of phase sequence (rotation) for three‑phase systems under defined operating conditions.
  • Performance: declared operating ranges, influence‑quantity limits and uncertainty considerations referenced to the series’ general uncertainty requirements.
  • Safety and protection: protective construction, insulation and overvoltage/measurement category considerations consistent with test‑equipment safety standards.
  • Marking and operating instructions: required user information, warnings and connection diagrams to ensure safe use and correct interpretation of indications.
  • Type and routine tests: specified tests to verify compliance with performance and safety requirements for production and verification.

Typical use and users

Used by electricians, commissioning and maintenance engineers, test‑equipment manufacturers, inspection and verification bodies, and safety officers to confirm correct phase rotation before connecting motors, phase‑sensitive equipment or protective devices. The part is applied where a clear, safe and unambiguous phase‑sequence indication is required.

Related standards

IEC 61557-1 (General requirements for the IEC 61557 series); IEC 61557-2 (Insulation resistance); IEC 61557-4 (Loop impedance and related measurements); IEC 61557-5 (Resistance to earth); IEC 61557-8 (Insulation monitoring devices); IEC 61557-14, -16 and other parts that define requirements for specific tests and equipment within the same series. These parts are intended to be used together where measurement tasks overlap.

Keywords

phase sequence; phase rotation; three‑phase testing; IEC 61557; electrical safety; low‑voltage distribution; test and measurement equipment; marking; performance requirements.

FAQ

Q: What is this standard?

A: IEC 61557-7 is the part of the IEC 61557 series that specifies requirements for equipment used to detect or indicate phase sequence (rotation) in three‑phase low‑voltage distribution systems. The current consolidated edition incorporates Amendment 1 published in 2023.

Q: What does it cover?

A: It covers functional performance, safety, marking, operating instructions and test methods specific to phase‑sequence measuring instruments; it is intended to be applied alongside IEC 61557-1 (general requirements).

Q: Who typically uses it?

A: Electricians, commissioning and maintenance personnel, test‑equipment manufacturers and conformity/inspection bodies use this standard to design, select and verify instruments for safe phase‑sequence testing.

Q: Is it current or superseded?

A: The consolidated edition (IEC 61557-7:2019 + AMD1:2023) is published and current; the IEC webstore lists the consolidated/amended edition and a stability date for the series updates. Users should check national adoptions or amendments for the latest endorsed versions in their country.

Q: Is it part of a series?

A: Yes — IEC 61557 is a multi‑part series covering test, measurement and monitoring equipment for protective measures in low‑voltage systems (parts include -1 general, -2, -4, -5, -7, -8, -14, -16, etc.). Parts are used together when instruments perform multiple measurement tasks.

Q: What are the key keywords?

A: Phase sequence, phase rotation, three‑phase, test equipment, electrical safety, low‑voltage distribution, IEC 61557.