Online Standards Store PDF
Geotechnical design. Part 2. Ground investigation and testing (including cor. as of February 2009)
Document status: Active
Heating systems. Design and construction of underground industrial foamed polyurefhane lagged pipes laying heating systems
Document status: Active
Life cycle of construction projects. Part 3. Requirements for information models at the stage of design preparation of construction
Document status: Active
Soil bases of buildings and structures (amd. 18.03.2021 - 30-NK)
Document status: Active
Fire automation of buildings and structures (amd. 08.10.2024)
Document status: Active