United power system and isolated power systems. Electric power systems. Operational dispatching control. Procedure for preparation of conclusion on possibility of decommissioning of generating facility of power stations that is considered as object of dispatching. Norms and requirements
Food products, food raw materials, feed. Determination of inorganic arsenic by high-performance liquid chromatography-mass spectrometry with inductively coupled plasma