United power system and isolated power systems. Electrical networks. Ice-melting systems on conductors and ground-wire cable of the overhead transmission line. The choice and basis of principal technical solutions
State system for ensuring the uniformity of measurements. State verification schedule for means of measuring of the energy, of the distribution of energy density, of the pulse duration and of the laser wavelength in the wavelength range from 0,3 to 2,0 m