Online Standards Store PDF
Power sources. Primary cells and secondary cells. Dimensions
Document status: Withdrawn
Magnet wire. Test procedure for the dimensions and increase in dimensions due to the covering measuring
Document status: Active
Water-tube boilers and auxiliary installations. Part 13. Requirements for flue gas cleaning systems
Document status: Active
Electric energy semiconductor converters with power 5 kV x A and higher. Marking, packing, transportation and storage
Document status: Active
Cable, wires, cord and armature. Marking, packing, carriage and storage
Document status: Active
Low-voltage switchgear and controlgear. Part 7. Ancillary equipment. Section 1. Terminal blocks for copper conductors
Document status: Replaced by GOST R 50030.7.1-2009