Perfomance and acceptance of works on construction of collector tunnels constructed by shield driving method (QR 06.07 - Construction Regulation 06.07)
Hydraulic structures on the irrigation and collector-drainage network. Organization, production and acceptance of works (QR 07.04 - Construction Regulation 07.04)