GOST PDF
Roofing handwork. Installation of roofs with roofing from clay and concrete tiles. Rules and control of work
Document status: Active
Roofing handwork. Roof installation with waterproofing from mastic materials. Rules and control of work
Document status: Active
Translucent enclosing structures. Works on the installation of zenith skylight lights. General requirements for performance and control of works
Document status: Active
Two-level laying of cable lines in cable structures and industrial premises. General requirements
Document status: Active
Green' standard. 'Green' residential building. Assessment method and criteria for design, construction and maintenance
Document status: Active
Trunk pipeline transport of oil and oil products. Uninterruptible power supply units of systems auxiliary systems and automation systems. General specifications
Document status: Active